Lencore Spectra i.Net: Installation and Operations Manual Manuel d'utilisateur Page 28

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 58
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 27
section 5
5.9 | schematics
Connect each power supply and i.Lon Central Control Server and MPI to a dedicated 20
amp receptacle. Each dedicated circuit must be a 120V/20 amp.
Once each item is connected, you may visually observe in the power supply a lit green
LED, and sequencing of lights on the i.Lon® server and MPI.
The i.Lon® needs approximately two minutes to completely boot up.
You will not hear any sound for approximately 30 seconds. The OPs count down from 20
to 0 before booting up. (This permits new software/firmware uploads and tracking of
any corrupt data.)
TO POWER THE SYSTEM:
ONCE THE SYSTEM IS PLUGGED IN:
2
1
24
Vue de la page 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 57 58

Commentaires sur ces manuels

Pas de commentaire